The Glebe Nash Road Whaddon Milton Keynes MK17 ONQ

e-mail:  info@dgsconstruction.co.uk

 

"The final solution required that the delicate timber frame structure be repaired in situ. The internal scaffolding was used to support the entire structure, whilst the brick infill panels were removed and rotten oak beams were replaced. A new foundation trench was dug and filled with concrete to eventually support everything above it."